Customization: | Available |
---|---|
Material: | Cast Steel,SS304,SS316,Stainless Steel |
Stator Material: | NBR,FPM,EPDM, Food Grade Rubber |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Spare parts Product name |
1. Suction casing 2. Discharge casing 3.Stator 4. Rotor 5. Rotating Parts 6. Stuffing Box Unit |
Reverse-engineering | FARO 3D Laser Scanning, Laser Alignment, Design model, Computational Fluid Dynamics CFD |
Material | ASTM, ANSI, SAE, UNS, DIN, EN, ISO, TOCT Cast iron / Cast steel WCB / SS304 / SS316 , Ni-Cr-Mo-Ti Steel SBBPF®, EPBPF®, VI, CB, PTFE, EH, VN |
Mould and Casting | Investment casting mould, Sand casting mould Investment Casting: Wax injection, Clusters assembly, Coating & Sanding, Dewaxing, Casting, Post cleaning, Heat treatment, Inspection |
Process | CNC machining, Auto lathe machining, Meter lathe machining, Wire cutting, EDM cutting, Gringding, Milling, Drilling, Screwing, Cutting, Stamping |
Surface treatment | Blacking, Polishing, Anodize, Chrome plating, Zinc plating, Nickel plating or other as requirements |
Inspection | Material certificate, Hydrostatic testing, Impeller static & dynamic balancing testing, Non-destructive testing(PT/ RT/ UT/ MT), 3D coordinator, Hardness tester, Roughness tester |
Certificate | ISO9001:2015, ISO14001:2004 |
Packing | 1. Small part, single packed then put into paper carton 2. Wooden crates suitable for shipping on the sea 3. We also consider customers' special needs for packing |
Delivery | 30 days after receiving the deposit. |
Payment | 70%TT in advance and the balance is paid against the copy of B/L. |
Mode of transport | 1. Express 2. Sea freight 3. Air shipping 4. Land transport 5. Post |
8235/8236:universal joint sleeve | 5115/5116:Steel sleeve | 1999:Rotor | |||
5075/5076: rod pin | 5425/5426:Securing ring | 3005:Stator | |||
5065/5066:Bomb cage washer | 8060/8061: 0 ring | 1998:coupling rod | |||
1050:shaft | 0000:......... | 0000:.........… |
one stage pump | two stages pump | three stages pump | four stages pump | |||
NM015BY01L06B/V | NM015BY02S12B/V | NM015BYO3S18B/V | NM015BY04S24B/V | |||
NM021BY01L06B/V | NM021BYO2S12B/V | NM021BY03S18B/V | NM021BY04S24B/V | |||
NM031BY01L06B/V | NM031BY02S12B/V | NM031BY03S18B/V | NM031BY04S24B/V | |||
NM038BY01L06B/V | NM038BYO2S12B/V | NM038BY03S18B/V | NM038BY04S24B/V | |||
NM045BYO1L06B/V | NM045BY02S12B/V | NM045BY03S18B/V | NM045BY04S24B/V | |||
NM053BYO1L06B/V | NM053BY02S12B/V | NM053BY03S18B/V | NM053BY04S24B/V | |||
NM063BY01L06B/V | NM063BY02S12B/V | NM063BY03S18B/V | NM063BY04S24B/V | |||
NM076BYO1L06B/V | NM076BY02S12B/V | NM076BY03S18B/V | NM076BY04S24B/V | |||
NM090BY01L06B/V/Z | NM090BY02S12B/V/Z | NM090BY03S18B/V/Z | NM090BY04S24B/V/Z | |||
NM105BY01L06B/V/Z | NM105BYO2S12B/V/Z | NM105BY03S18B/V/Z | NM105BY04S24B/V/Z | |||
NM125BY01L06B/V/Z | NM125BYO2S12B/V/Z | NM125BY03S18B/V/Z | NM125BY04S24B/V/Z | |||
Double-ended one stage | Double-ended two stages | other model | ||||
NM015BYO1P05B/V | NM015BY02D12B/V | NM003BY11S12B | ||||
NM021BY01P05B/V | NM021BY02D12B/V | NM005BY06S12B | ||||
NM031BYO1P05B/V | NM031BY02D12B/V | NM008BY03S18B | ||||
NM038BY01P05B/V | NM038BY02D12B/V | NM011BY01L06B | ||||
NM045BYO1P05B/V | NM045BY02D12B/V | NM011BY02S12B | ||||
NM053BY01P05B/V | NM053BY02D12B/V | ...... | ||||
NM063BY01P05B/V | NM063BY02D12B/V | |||||
NM076BY01P05B/V | NM076BY02D12B/V | |||||
NM090BY01P05B/V | NM090BY02D12B/V/Z | … | ||||
NM105B/VY01P05B/V/Z | NM105BY02D12B/V/Z | … | ||||
NM125BY01P05B/V/Z | NM125BYO2D12B/V/Z |